The clean that decides whether you hand over on time
Post-construction cleaning is not one deep clean at the end. It is a sequence. Debris has to leave the site while trades are still working. Dust settles for days after drywall. Punch list work leaves fresh marks after the space already looked finished.
Treating it as a single job at the end is the most common reason a walkthrough slips. We schedule around your build, not around ours.
Site photo
Wide shot of a finished commercial space, bright and clean. At least 1600px wide.
Three cleans, not one
Each pass happens at a different moment and does a different job.
During construction
Rough clean
Debris haul-out, sweep-downs and trash removal between trades. Keeps the site walkable and safe while framing, drywall and MEP work continue.
After the last trade
Final clean
Top-to-bottom dust removal, windows and glass, fixtures, vents, cabinetry and floors detailed for handover. This is the pass the owner actually sees.
Before walkthrough
Touch-up clean
Punch list work always leaves marks. We come back after it is finished so the building is spotless on inspection day.
What is included
Every scope is written for the building. This is the standard list we work from.
Construction dust removal, wall to ceiling
Window, glass, frame and sill detailing
Adhesive, paint, grout and sticker haze removal
Light fixtures, vents and diffusers
Floor scrub, buff, wax and final polish
Restroom fixtures, partitions and sanitizing
Cabinetry, millwork and interior glass
Debris, packaging and pallet haul-away
Who we work with
We work to your programme, not the other way round.
General contractors
You have a turnover date and a punch list. We schedule around both and stay out of the trades way.
Property managers
New tenant fit-outs handed over clean, on the day the lease says.
Developers & owners
Multi-floor buildouts and full renovations, phased so occupied floors are never disrupted.